In Irkutsk, from May 20 to 24 and from May 27 to 31, scheduled hydraulic tests will be held, causing hot water to be shut off in some neighborhoods. After that, from late May to September, repair work is planned on the heating networks, which will also cause local cold water outages in some parts of the city. The administration reminded that residents must be warned in advance of each outage by posting notices in entrances.
In connection with scheduled hydraulic tests, hot water supply will be shut off from May 20 to May 24 in the Sinyushina Gora, Pervomaysky, and Universitetsky neighborhoods; in Studgorodok (Kurchatov St., Igoshin St., Lermontov St., Kolkhoznaya St.), and on Zhukovsky St., Lermontov St., 2-aya Zheleznodorozhnaya St., Kayskaya St., Botkina St., Voronezhskaya St., and Banzarova St.From May 27 to May 31, there will be no hot water in the houses of the Yubileyny, Raduzhny, Akademgorodok, and Primorsky neighborhoods, on Pomyalovskogo St., Akademicheskaya St., Geologov St., Mukhinoi St., Yuzhnaya St., in the 1st and 2nd GES settlements, and in the VNIIFTRI area.
Following the tests, repair work will be carried out on the heating networks from late May through September. This will also lead to localized cold water shutoffs. To carry out repair and preventive work on the water supply and sewer networks and pumping stations, cold water will be shut off in the Universitetsky neighborhood from 10:00 p.m. on June 27 to 4:00 a.m. on June 29, and on Bezbokova St. from 10:00 p.m. on August 29 to 6:00 a.m. on September 1.
Deputy Chairman of the Committee for the Administration of the Sverdlovsky District Denis Kozlov drew the attention of representatives of all agencies to the mandatory notification of residents about upcoming shutoffs – notices must be posted in all entrances in a timely manner.
Based on materials from the press service of the administration of the city of Irkutsk