Committee specialists for the management of Irkutsks Oktyabrsky District together with representatives of the Safe City municipal institution checked how ready the boiler houses are for winter. There are three heat sources in the district, supplying heat to residential buildings, and in summer they were repaired, equipment was checked, and a fuel reserve was prepared. Now the boiler houses are 90 percent ready, and they plan to complete preparations for the heating season by September 10.

Specialists from the committee for the administration of the Oktyabrsky District of the administration of the city of Irkutsk, together with representatives of the municipal institution “Safe City,” checked the readiness of the boiler houses for operation during the winter period.
The district has 3 boiler houses, which provide heat supply to residential buildings.
In the summer, repairs were carried out at the heat sources, boiler equipment was inspected, and a fuel reserve was prepared.
The readiness of the boiler houses is 90%. The deadline for completing preparations for the heating season is September 10.